KJTS Group Berhad (KJTS or the Company) (KLSE: KJTS), a regional engineering services company specialising in integrated energy management solutions, has entered into a 20-year Design, Build and Operate Agreement through its Thailand subsidiary, KJTN Engineering Company Limited (KJTN Engineering), with Synphaet Company Limited for the chiller plant at Building 2 of Synphaet Ramintra Hospital in Khan Na Yao, Bangkok.
Under the Cooling as a Service arrangement, KJTN Engineering will fund approximately THB22.7 million of capital expenditure for the build and project management works. It will operate and maintain the chiller plant and supply chilled water over the 20-year service period. The hospital will pay a fixed monthly chilled water fee together with a variable fee based on metered chilled water consumption. The agreement provides for ownership of the chiller plant to transfer to Synphaet Company Limited at the end of the term. The chilled water fees are payable monthly in arrears from the date chilled water is first delivered.
As part of the agreement, KJTN Engineering will retrofit the existing chiller plant into a more energy-efficient system. This includes replacing some of the major equipment and putting in integrated plant controls with real-time remote monitoring, so the plant can be run according to cooling demand and weather conditions. Metering and monitoring equipment will also be installed so that chilled water use and plant performance can be measured and verified.
KJTS Group Managing Director KC Lee said the agreement marks an important step for the Group in Thailand, as it takes a model proven in hospitality into a sector where reliability matters just as much, if not more.
“Our work with Centara over the past few years has shown what this model can deliver for hotels, and Synphaet is where we bring the same approach into a hospital in Thailand. Hospital cooling is an important part of the building environment, and the plant needs to be operated and maintained carefully throughout the service period. Our engineering expertise and long-term operating experience are important because we are responsible for the plant over the 20-year agreement,” said Lee.
“Thailand has grown steadily for us, and this agreement shows that the Cooling as a Service model works beyond hotels. More building owners here are starting to look at cooling as a long-term operating cost to be managed well, not a one-off purchase, and many would rather put their capital into their core business than into a chiller plant. That is the conversation we want to keep having across the country, with hospitals, hotels and commercial buildings alike. We look forward to supporting Synphaet across its hospitals as well as other healthcare providers in Thailand,” he added.
KJTN Engineering has operated in Thailand since 2021 and signed its first long-term cooling agreement with the Central Group in 2024, for Centara Grand Hotel at CentralWorld in Bangkok. That relationship has since grown to seven Centara properties, including the four 20-year agreements announced in September 2026 for Centara Reserve Samui, Centara Hotel Hat Yai, Centara Grand Beach Resort Phuket and Centara Karon Resort Phuket. The Synphaet Ramintra agreement is KJTN Engineering’s first healthcare agreement in Thailand, and draws on KJTS Group’s hospital experience in Malaysia, which includes air conditioning and mechanical ventilation works for Cengild Specialist Hospital in Kuala Lumpur, secured earlier this year. It widens the Thailand portfolio into a sector where the performance of the cooling plant is closely tied to patient care.
Khun Kitti Chungsawanant, Director of KJTN Engineering, said the agreement builds on the trust the team has earned with Thai building owners through its hotel projects.
“In a hospital, the cooling plant is part of the care environment. The Synphaet team needed confidence that the plant would be designed properly, upgraded carefully and looked after for the long term, and the track record we have built with Centara gave us a strong starting point for that conversation. As a Thai company working hand in hand with KJTS, we can bring the Group’s engineering expertise to our customers while staying close to them here,” said Khun Kitti.
“Hospitals are always weighing where their capital should go, and most would rather it went into patient care than into a chiller plant. Cooling as a Service lets them upgrade without that trade-off, and it puts the responsibility for how the plant performs on us. We look forward to showing what this approach can do at Synphaet Ramintra, and to working with more hospitals across Thailand,” he added.
The build and project management works are scheduled to commence in December 2026 and be completed in May 2027. Operation and maintenance services and chilled water supply are scheduled to run from May 2027 to April 2047, subject to the agreement and any permitted extensions. The agreement marks KJTS Group’s first Cooling as a Service offering in Thailand to the healthcare sector.


