Case Study | Thailand

ROT of Chiller Plant with guaranteed performance

Sector: Hospitality
Location: Chonburi, Thailand
Contract Model: ROT (Retrofit – Operate – Transfer)
energy savings
0 %
kWh saved yearly
20 m
tonnes CO₂ avoided
0
  • Challenge

    The coastal location demanded durable materials and construction methods to withstand salt exposure and humidity. The retrofit had to be executed without disrupting guest comfort or daily operations in a fully occupied resort.

  • Solution

    Two new high-efficiency water-cooled chillers were installed under the ROT model. System transfer and installation were executed seamlessly, maintaining continuous cooling while improving overall energy performance.

  • Outcome

    The project achieved 25% energy savings, cutting consumption by over 1 million kWh annually and avoiding 490 tonnes of CO₂ emissions. The upgraded system continues to deliver stable cooling, long-term reliability, and sustained operational efficiency