Case Study | Malaysia

Chiller Plant Retrofit and System Efficiency Upgrade

Sector: Government Building
Location: Kedah, Malaysia
Contract Model:
ROT (Retrofit – Operate – Transfer)
actual savings
0 %
kWh saved
0
tonnes CO₂ avoided
0
  • Challenge

    Three chillers were non operational and the remaining plant equipment had constant breakdowns. The chiller plant could not meet load requirements due to insufficient capacity, ageing equipment, and limited support for proper O&M.

  • Solution

    KJTS carried out a technical audit of the ACMV system. Findings showed an aged air-cooled plant running at poor efficiency. The proposed upgrade included a new energy efficient water-cooled chiller plant equipped with advanced monitoring and control systems.

  • Outcome

    The ROT solution guarantees 55 percent reduction in the TNB bill. Environmental impact equals 11,316 trees or 226 acres of forest.