Case Study | Thailand

BOT of Chiller Plant Upgrade

Sector: Hospitality
Location: Prachuap Khiri Khan, Thailand
Contract Model:
BOT (Build – Operate – Transfer)

Energy Savings Guaranteed
0 %
Hour Stable Operation
0
Long-term plant
cost stability
  • Challenge

    The 24-hour operation required seamless cooling throughout construction. Coastal conditions demanded durable materials and precise engineering. The project also involved relocating the chiller plant and coordinating across multiple contractors in both existing and new build zones.

  • Solution

    Three new high-efficiency water-cooled chillers were installed. EPC works covered the full airside system (AHU, FCU, OAU) and chilled water distribution network. The BOT model included a 20-year guarantee for chilled water cost and total plant efficiency.

  • Outcome

    The project remains on schedule. 21% energy savings are guaranteed even with higher cooling loads. The upgraded system delivers long-term reliability, efficiency, and uninterrupted operation across the entire resort.